City of Mukilteo, Washington - Official Site
Advanced Search

By The Way Plan
Annual Report
Applications and Resource Materials
Building Division
Capital Facility Projects Portal
Code Amendments
Comprehensive Plan
Development and Permit Services
*Critical Areas Mitigation Program
*Code Compliance
Downtown Waterfront Master Plan
Economic Development
Japanese Gulch Master Plan
Land Use Action Notices
Long Range Planning
Municipal Code
Online Permit Center
Permit Division
Sign Code
Smuggler's Gulch Low Impact Development and Retrofit Project
Sustainable Mukilteo
Tree Topping

Calendar
Documents and Forms
Employment Opportunities
Frequently Asked Questions
News
Staff Directory

11930 Cyrus Way
Mukilteo, WA 98275
Phone: 425.263.8000


Subscribe To Our Site

Ferry Cam

Current Traffic

Google+

 / Planning & Community Development / Development and Permit Services / Critical Areas Mitigation Program

Critical Areas Mitigation Program

CRITICAL AREAS MITIGATION PROGRAM

Being a coastal community, Mukilteo is blessed with many natural features such as forested ravines, streams, and wetlands.  Wetlands in particular have been strictly regulated by the Department of Ecology since the mid-1980’s and have limited the development potential of property. However in late 2010 Ecology, with the Corp of Engineers, established new rules that allow for more development flexibility thus the City is developing a new program that takes advantage of these new state rules.  Our new program, once adopted, will offer more flexibility for property owners to explore off-site mitigation options for mitigating unavoidable impacts to wetlands in order to develop in-fill properties.
 
In the past, unavoidable impacts to wetlands were required to be mitigated on-site, limiting development potential for properties containing wetlands. Additionally, on-site mitigation does not always help meet the broader ecological goals or functions of wetlands. The new rules, along with the proposed wetland mitigation program will allow property owners the option of expanding or restoring existing wetlands on City-owned property versus on-site mitigation.
 
The City’s new wetland mitigation program has identified specific locations where mitigation is allowed. This off-site mitigation program takes a watershed approach and focuses on locations where there is known potential for wetland function improvement.  This watershed approach incorporates our collective understanding on how ecological processes determine ecological functions of a drainage basin, determining how ecological processes have been altered by development, and identifies areas where processes can be most effectively restored and where they are most in need of protection. Other environmental benefits of the program include improving water quality, managing water flow, and increasing water storage capacity. Examples of off-site mitigation options in the draft program include creating new wetlands, restoring existing deteriorated wetlands, removal of impervious surface area, removing fish barriers and improving wildlife habitat.  In combination, it creates a more comprehensive approach to watersheds as wetlands are usually near the headwaters of a stream system.
 
The City hired Environmental Science Associates (ESA) to help develop this off-site mitigation program that evaluates our drainage basins and predetermines where off-site mitigation would be appropriate and sustainable. The program focuses on Japanese Gulch, Big Gulch, and Picnic Point Gulch.  Our goal is that by preparing an Off-Site Mitigation program, we as a City can initiate a long term program that can improve our environment while providing options to those who want to develop their in-fill property.  A study conducted in 2010 of the City’s three main drainage basins resulted in the identification of eleven sites within Mukilteo and its UGA that provide the opportunity for sustainable critical area mitigation.
 
The expanded new program has several mitigation options which a property owner can choose from:
  1. Traditional On-Site Mitigation:  Mitigation, such as wetland creation, re-establishment, or enhancement is conducted on the same parcel as the impact. The on-site mitigation follows the traditional mitigation sequencing steps: avoidance, minimization, and finally compensation.  If compensation is proposed, then mitigation would occur on site by meeting the established mitigation ratios and planning requirements for the type of impacts proposed.
  2. Off-Site Mitigation: Using the watershed approach described above, a property owner could mitigate their wetland or buffer impacts off site in a predetermined location which is connected to a larger ecosystem.  The ecosystem alternative approach is based on detailed review of the City’s (and UGA) drainage basins and critical area habitat.  This type of mitigation would balance the objective of protecting valuable environmental ecosystems while accommodating growth of residential, commercial and industrial needs of the community.  The off-site mitigation sites are located on both public and private property:  use of public sites is allowed by this program and use of private property will only be allowed if approved by the private property owner.
  1. Fee In-Lieu Fee Program: Fee In-Lieu allows a property owner to reduce on-site buffer widths in exchange for making sure that water quality facilities are installed on the site, and contributing money to a City managed Fee In-Lieu program.  The City then uses money from the program to purchase land for protection or enhance a City restoration site as described in the program. 
  1. Off-Site Mitigation Bank: As an alternative to the options noted above, a property owner would have the option of paying into an approved wetland mitigation bank to compensate for their wetland impacts.

Click here for complete plan.